HVAC Permit Inspection in Vancouver — What the Inspector Checks

Published: July 21, 2026 — CANRO Heating & Cooling — Greater Vancouver, BC

What Inspectors Check

Gas piping: proper sizing, secure connections, drip leg, accessible shutoff valve, and bonding for CSST. Venting: proper materials, clearances from combustibles, termination location and clearances. Combustion air: adequate supply for the appliance. Electrical: proper disconnect, wire sizing, and connections. Seismic strapping: water heaters and boilers properly secured. Clearances: appliance clearances to combustible materials.

Inspection Process

Your contractor schedules the inspection with the municipality. The inspector arrives during the appointment window, reviews the installation, and either passes the work or lists deficiencies. If deficiencies are found, the contractor corrects them and calls for a re-inspection. Most straightforward installations pass on the first inspection.

Why Permits Matter

Permits ensure your installation meets BC safety codes. An unpermitted installation may: void your home insurance, cause issues during home sale (buyers inspectors may flag unpermitted work), potentially create safety hazards, and result in fines from the municipality if discovered. Always verify your contractor pulls the required permits.

Safety Reminder

If you smell gas, suspect carbon monoxide or believe there is an immediate danger, leave the property and contact emergency services or the appropriate gas emergency authority. Do not remain inside — exit the building immediately and call for help from outside.